The Quote Said $80,000. The Bill Hit $240,000. Here’s Why.
A founder called me after the fact. Too late to help, early enough to learn.
He’d greenlit a custom software build. The shop quoted $80,000. Reasonable, he thought. He signed.
The first invoice looked fine. So did the second. Then the change orders started. A little more scope here. A tricky integration there. Each one small enough to approve without a second thought. Nobody laid them end to end. By the time it shipped, late, he’d paid $240,000. Three times the quote.
Not fraud. A missing translator.
The dev shop didn’t cheat him. Software overruns are normal. Estimates are best guesses, and the hard parts hide under the surface. The shop knew that. He didn’t. And no one on his side translated the risk before he signed.
A fractional CTO reads the statement of work before the ink dries. Spots the vague lines that turn into change orders. Sets a real number, with a real buffer. Then watches the build and calls the overrun early, while it’s still $20K, not $160K.
One day a week would have saved this man $160,000. The estimate is a story the vendor tells. Get someone who can read the ending.